Customization: | Available |
---|---|
After-sales Service: | 10 Year |
Warranty: | 5 Years |
Still deciding? Get samples of US$ 0/Meter
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Pn8~16 High Density Polyethylene HDPE Pipe for Water Supply/Gas/Mining/Agriculture Irrigation/Electric Cable/Conduit Pipe/Drainage plastic HDPE pipe CE ISO
Applications
1) Municipal water supply, gas supply and agriculture etc.
2) Commercial & Residential water supply.
3) Industrial liquids transportation.
4) Sewage treatment.
5) Food and chemical industry.
7) Replacement of cement pipes and steel pipes.
8) Argillaceous silt, mud transportation.
9) Garden green pipe networks.
Material | PE80 PE100 |
Pressure | 0.4Mpa, 0.6Mpa, 0.8Mpa, 1.0Mpa, 1.25Mpa, 1.6Mpa, |
Standard | ISO4427, ISO8772, DIN8074/8075 |
Color | Black/Blue/Other |
Form supply | 6m/9m/12m/other |
HDPE PIPE(PE100) | |||||||||
Wall thickness / en (mm) | |||||||||
2.5MPa | 2.0MPa | 1.6MPa | 1.25MPa | 1.0MPa | 0.8MPa | 0.6MPa | 0.5MPa | 0.4MPa | |
dn (mm) | SDR7.4 | SDR9 | SDR11 | SDR13.6 | SDR17 | SDR21 | SDR26 | SDR33 | SDR41 |
20 | 3 | 2.3 | 2 | - | - | - | - | - | - |
25 | 3.5 | 3 | 2.3 | 2 | - | - | - | - | - |
32 | 4.4 | 3.6 | 3 | 2.4 | - | - | - | - | - |
40 | 5.5 | 4.5 | 3.7 | 3 | - | - | - | - | - |
50 | 6.9 | 5.6 | 4.6 | 3.7 | 3 | - | - | - | - |
63 | 8.6 | 7.1 | 5.8 | 4.7 | 3.8 | - | - | - | - |
75 | 10.3 | 8.4 | 6.8 | 5.6 | 4.5 | - | - | - | - |
90 | 12.3 | 10.1 | 8.2 | 6.7 | 5.4 | 4.3 | - | - | - |
110 | 15.1 | 12.3 | 10 | 8.1 | 6.6 | 5.3 | 4.2 | - | - |
125 | 17.1 | 14 | 11.4 | 9.2 | 7.4 | 6 | 4.8 | - | - |
140 | 19.2 | 15.7 | 12.7 | 10.3 | 8.3 | 6.7 | 5.4 | - | - |
160 | 21.9 | 17.9 | 14.6 | 11.8 | 9.5 | 7.7 | 6.2 | - | - |
180 | 24.6 | 20.1 | 16.4 | 13.3 | 10.7 | 8.6 | 6.9 | - | - |
200 | 27.4 | 22.4 | 18.2 | 14.7 | 11.9 | 9.6 | 7.7 | - | - |
225 | 30.8 | 25.2 | 20.5 | 16.6 | 13.4 | 10.8 | 8.6 | - | - |
250 | 34.2 | 27.9 | 22.7 | 18.4 | 14.8 | 11.9 | 9.6 | - | - |
280 | 38.3 | 31.3 | 25.4 | 20.6 | 16.6 | 13.4 | 10.7 | - | - |
315 | 43.1 | 35.2 | 28.6 | 23.2 | 18.7 | 15 | 12.1 | 9.7 | 7.7 |
355 | 48.5 | 39.7 | 32.2 | 26.1 | 21.1 | 16.9 | 13.6 | 10.9 | 8.7 |
400 | 54.7 | 44.7 | 36.3 | 29.4 | 23.7 | 19.1 | 15.3 | 12.3 | 9.8 |
450 | 61.5 | 50.3 | 40.9 | 33.1 | 26.7 | 21.5 | 17.2 | 13.8 | 11 |
500 | - | 55.8 | 45.4 | 36.8 | 29.7 | 23.9 | 19.1 | 15.3 | 12.3 |
560 | - | 62.5 | 50.8 | 41.2 | 33.2 | 26.7 | 21.4 | 17.2 | 13.7 |
630 | - | 70.3 | 57.2 | 46.3 | 37.4 | 30 | 24.1 | 19.3 | 15.4 |
710 | - | 79.3 | 64.5 | 52.2 | 42.1 | 33.9 | 27.2 | 21.8 | 17.4 |
800 | - | 89.3 | 72.6 | 58.8 | 47.4 | 38.1 | 30.6 | 24.5 | 19.6 |
900 | - | - | 81.7 | 66.2 | 53.3 | 42.9 | 34.4 | 27.6 | 22 |
1000 | - | - | 90.9 | 72.5 | 59.3 | 47.7 | 38.2 | 30.6 | 24.5 |
1200 | - | - | 109.1 | 88.2 | 67.9 | 57.2 | 45.9 | 36.7 | 29.4 |
1400 | - | - | - | 102.9 | 82.4 | 66.7 | 53.5 | 42.9 | 34.3 |
1600 | - | - | - | 117.6 | 94.1 | 76.2 | 61.2 | 49 |
FAQ
Q2:How to deal with the faulty?
A:Firstly,our products are produced in strict quality control system and the defective rate will be less than 0.2%
Secondly,during the guarantee period,we will send new pipes with new order for small quantity.For defective batch products,we will repair them and resend them to you or we can discuss the solution accoring to real situation
Q3:What is your MOQ?
A: Most products we have stocks,so any quantity can acceptable,for customized ordered should be 500pcs for each item.
Q4: The price of your products is higher than others.
A: We can't promise you the best price, but we can promise you the best quality. Our products are made of imported raw material and produced in strict quality control system,it is also has strictly testing and quality checking procedure before packing and shipping
Q5: Which items are you manage?
A: PPR,HDPE,PE-RT,PVC,CPVC,PVC-U series
Q6: How can i get assurance from you?
A: You can trade with us through alibaba assurance order,it will keep safty for your order
Q7: Can i visit the factory firstly before place order?
A: We are warmly welcome all the customer friends visit us and learn us
Q8: Leading time
A: Stocks, goods will be ready in 7 days after receive deposite,customized goods will be ready in 15 days after receive deposite
Exactly leading time pls confirm with sales before ordered
Q9: Payment terms
A: Payment by TT,30% deposite before production,70% balance against BL copy
L/C,Payple,western union,moneygram and others also can accept against different situation